An Evaluation Of Construction Project Manager Software

By Jaclyn Hurley


Computers are dedicated systems that are run by special applications installed. These applications are used for data entry and manipulations. The applications define the various inputs and the expected outputs. They also help managers plan for the resource allocation and uses. Most of the managers use the specially developed construction project manager software in the planning and allocations of available resources.

Planning breaks down the operations that are to accomplish the entire project. This puts each of smaller operations into perspective. The definition of objectives takes place at this stage. The expected inputs are defined. The expected outputs are also defined at this stage. This process focuses on giving the projects a sense of direction.

Cost estimation is done to determine the feasibility of projects under consideration. This is very important in that the benefits to be enjoyed are weighed against the costs that are to be incurred. The costs of materials to be used ought to be aggregated. This is done by drafting the budgets. They take into consideration the various costs that may be incurred at each stage. The flexible budgets are also drafted. These are used in cases where the costs of materials fluctuate. This is especially in times of very high rates on inflation.

Scheduling lays the foundation for a specific project. This is done by breaking down the projects into smaller operations. Through this process, the managers are able to estimate the time that may be used at each stage. The scheduling tools are made available in special packages which have to be added into the programs. The management of time is very important since the projects have to be completed by the specified time frame. Delays may increase the costs of construction.

Dependency charts are very important in establishing the different relationships that exist between various components. These are drafted and drawn by the use of special dependency tools in the computer programs. The core processes are undertaken first and the other supporting operations follow later. This focuses on sequencing of operations. The risk of occurrence of errors is reduced by sequencing of operations.

There are a couple of constraints that should be managed very well. Warning systems are used to manage these parameters. Time, scope and costs are the major parameters that the system manages. This is done so as reduce the delays in completion of various operations. A warning is issued in the event that the thresholds are exceeded.

The management of human resources is very complex. There are engineers that are employed by the firms undertaking the projects. There are designers who plan and undertake the feasibility tests. These have to be paid and allocated the required resources. The packages installed into computers are usually used for undertaking various operations relating to payments and resource allocation.

The process of estimation is very important. Through the process, the managers are able to come up with the expected results. After the completion of the projects in question, the expected results are compared with the actual results. This is used as basis of assessing the objectives achievement.